搜索
DA 284 Door Control Switch
Installation method
●Make a hole with a diameter of 40.5+0.5mm on the box wall and install the pressure compensation device with a nut. Ensure that the sealing gasket is on the outside of the cabinet. To achieve ideal pressure compensation, two pressure compensation devices can be installed on the two sides facing the top.
Copyright. 2022- 2023 接佳电气(上海)有限公司 Ail Rights Reserved. Shanghai ICP No. 12048522-1
中企动力 浦西